Resources

Documentation for your procurement teams.

Profiles, capability statements, certifications and the documentation needed to register Bobsco as a vendor — available on request. We respond to procurement requests within one business day.

Documents

What you can request from us.

01

Project Experience Sheet

Selected experience across LMP, steel structures, DNV units, MCC, civil/PEB and surface treatment.

Request
02

RFQ Checklist

Checklist to help clients submit a complete fabrication, construction or site-service enquiry.

Request
03

Company Profile

Overview of Bobsco Saudia's company history, capabilities, certifications, projects, facilities and clients.

Request
04

ISO Certificates

ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates.

Request
05

Capability Statement

Short document summarising fabrication, site services, engineering/construction and project supply capabilities.

Request
06

HSE & Quality Summary

Summary of IMS framework, safety controls, quality process and environmental responsibility.

Request
07

Company Profile

Overview of Bobsco Saudia's company history, capabilities, certifications, projects, facilities and clients.

Request
08

HSE & Quality Summary

Summary of IMS framework, safety controls, quality process and environmental responsibility.

Request
09

Capability Statement

Short document summarising fabrication, site services, engineering/construction and project supply capabilities.

Request
10

ISO Certificates

ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates.

Request
11

Project Experience Sheet

Selected experience across LMP, steel structures, DNV units, MCC, civil/PEB and surface treatment.

Request
12

RFQ Checklist

Checklist to help clients submit a complete fabrication, construction or site-service enquiry.

Request

RFQ Checklist

Help us respond with a structured proposal.

The more of these we have at enquiry stage, the faster and more accurate our response. Anything you can share helps.

01Scope of work — narrative description and any available drawings or P&IDs
02Project location, site access details and expected duration
03Material grades, codes and standards (e.g. ASME, API, AISC, SABIC, SAES)
04Inspection and testing requirements (NDT, hydrotest, FAT, SAT)
05HSE and client-specific quality requirements (ITP, QCP)
06Target delivery / commissioning / handover date
07Commercial framework — lump sum, BOQ, time & material or call-off
08Required documentation pack at handover

Glossary

Technical terms we use.

DNV— DNV 2.7-1

A certification standard commonly associated with offshore containers and lifting units used in marine and offshore environments.

LMP— Liquid Mud Plant

A facility used to store, mix and manage drilling mud or drilling fluid for oilfield operations.

MCC— Motor Control Centre

An assembly used to control electric motors in industrial facilities.

IMS— Integrated Management System

A combined management framework covering quality, environmental management and occupational health & safety.

Surface Treatment

Preparation and coating of metal surfaces through processes such as blasting and protective coating application.

PEB— Pre-Engineered Building

A steel building system designed and fabricated for efficient industrial and commercial construction.

MCC— Motor Control Centre

An assembly used to control electric motors in industrial facilities.

RFQ— Request for Quotation

A formal document inviting contractors to submit pricing and technical proposals for a defined scope of work.

QA/QC— Quality Assurance / Quality Control

Systematic activities to ensure that quality standards are met during fabrication, construction and project delivery.

IMS— Integrated Management System

A combined management framework covering quality, environmental management and occupational health & safety.

Surface Treatment

Preparation and coating of metal surfaces through processes such as blasting and protective coating application.

Fabrication

The process of cutting, shaping, welding and assembling metal components into structures, equipment or industrial assets.

HSE— Health, Safety & Environment

The management discipline covering occupational health, workplace safety and environmental protection in industrial operations.

PEB— Pre-Engineered Building

A steel building system designed and fabricated for efficient industrial and commercial construction.

PQ— Prequalification

The process by which a client evaluates a contractor's capability, certifications, track record and systems before awarding a contract.

DNV— DNV 2.7-1

A certification standard commonly associated with offshore containers and lifting units used in marine and offshore environments.

Commissioning

The systematic process of verifying and testing installed equipment or systems to ensure they function according to design specifications.

LMP— Liquid Mud Plant

A facility used to store, mix and manage drilling mud or drilling fluid for oilfield operations.

FAQs

Frequently asked questions.

Procurement & Sales

Talk directly to our team.

sales@bobscosaudia.com · +966 55 585 8394 · +966 8988857

+966 55 585 8394 · +966 8988857

Submit an RFQ